Sign In | Join Free | My frbiz.com
China Qingdao Tsin Steel Structure Construction Technology Co.,Ltd. logo
Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
Verified Supplier

1 Years

Home > Steel Frame Building >

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Brand Name : TSIN

Model Number : TSIN

Certification : ISO, CE, SGS

Place of Origin : Shandong, China

Place Of Origin : Qingdao, Shandong, China

MOQ : 1000 sqm

Price : USD 40-60 / sqm

Payment Terms : T/T,L/C

Supply Ability : 100,000 sqm / month

Delivery Time : 6 weeks after shop drawing get approval

Packaging Details : Packed on steel pallet with fixture and loaded into 40'HQ/OT

Warranty : 5 Years

Maintenance Costs : Reduced

Labor Costs : Lower

Connection : Bolts

Insulation : EPS, Glasswool, Rockwool, PU On Option

Thickness Of Panel : 50mm, 75mm, 100mm, 150mm, 200mm, 250mm

Using Life : 50 Years

Product : Steel Structure

Material Grade : Q355B, Q235B

Structure type : Portal frame

Design Load : Wind, Snow, Seismic

Design software : PKPM, Tekla structures, CAD

Sand blasting : Sa 2.5

Surface treatment : Anti-corrosive paint or hot dipped galvanized

Contact Now

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Product Description

Modern Prefabricated Steel Building

The Modern Prefabricated Steel Building is engineered for easy assembly and recyclability, making it an ideal option for industrial warehouses, offices, and residential applications. Constructed from high-quality steel, it features a robust load-bearing main frame composed of beams and columns.

Structural Components

This building includes a comprehensive bracing system to ensure stability and durability, comprising:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These components work seamlessly with precision-engineered roof, wall, and floor systems to create a reliable and resilient metal structure.

Advantages Over Traditional Concrete Buildings

  • Superior Strength:
    Constructed with steel plates or sectional steel, the structure offers enhanced structural integrity and improved seismic resistance.

  • Faster Construction:
    Prefabricated components enable quick on-site assembly, significantly reducing construction time.

  • Sustainability:
    Steel is both reusable and recyclable, minimizing construction waste and supporting environmentally friendly practices.

This modern steel building provides a versatile, efficient, and eco-friendly solution that effectively balances strength, speed, and sustainability for a wide range of applications.

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

PRODUCT SPECIFICATIONS
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool,PU insulation,Corrug ated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe,skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Large Span Modern Steel Frame Building Industrial Workshop Poultry House Large Span Modern Steel Frame Building Industrial Workshop Poultry House
Our Advantages
Advantages of Steel Structure Buildings
Easy to Assemble

Prefabricated steel components are installed on-site following detailed drawings. The assembly process includes erecting steel columns with cross-bracing, roof beams with horizontal bracing, and installing purlins and enclosure panels, ensuring efficient and precise construction.

Cost-Effectiveness

Steel's lightweight nature reduces foundation costs, while the rapid construction timeline enables earlier project completion and operation. Overall, steel structures provide better economic value compared to traditional concrete buildings.

Simplified Construction with Short Timelines

Factory-produced components are delivered and quickly assembled on-site, drastically reducing build times. A typical steel structure can often be completed within weeks.

Energy-Efficient & Eco-Friendly

Using corrugated color steel sheets and sandwich panels enhances insulation and energy savings. Dry construction methods minimize dust and pollution, while steel's recyclability further lessens environmental impact.


Differences Compared to Concrete Buildings
Shorter Construction Period

Prefabricated steel components require minimal on-site welding, resulting in significantly faster build times than concrete structures.

More Environmentally Friendly

Steel construction eliminates water use during assembly, reducing dust and pollution in the surrounding environment.

Better Cost Performance

Faster construction reduces labor costs, with total expenses typically 20-30% lower than traditional concrete buildings. Additionally, steel offers superior durability.

Lighter Structure

Lightweight metal walls and roofs greatly reduce the overall structural weight, easing foundation loads compared to brick or concrete alternatives.

Large Span Modern Steel Frame Building Industrial Workshop Poultry House Large Span Modern Steel Frame Building Industrial Workshop Poultry House
FAQ
1. What materials are used in your steel structure buildings?

Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.

2. What certifications do your steel structure buildings have?

Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.

3. How long is the construction period of a steel structure building?

The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.

4. Can steel structure buildings be customized according to needs?

Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.

5. Do you provide installation guidance for steel structure buildings?

We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.


Product Tags:

Large Span prefabricated steel building

      

Modern steel frame building

      

prefabricated steel structure

      
China Large Span Modern Steel Frame Building Industrial Workshop Poultry House wholesale

Large Span Modern Steel Frame Building Industrial Workshop Poultry House Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)